MGR Residential Apt

MGR Residential Apt

BIM
MGR-Senior Living Residential CLIENT: MGR, USAAREA: 3,53,114.0 Sq. FtLOCATION: Oakland, CA, USAPROJECT TEAM : VINOD, TRINADH, RUDRAPRASADLOD: 400STATUS : COMPLETED BIM CHALLENGE : 1) Coordinated and modelled all wall and floor framing model from scratch which includes structural and non-structural elements. 2) Created Custom Panel framing drawings for walls and floors for field to refer and construct. Drawings concentrated to differentiate structural to non-structural elements, wall and floor finishes, location of each panel in overall building and location of each metal stud with quantities.3) Coordinated with site manager with virtual meetings and helped arrive at sequencing for project construction and management. [SLGF id=221] Back
Read More
KIPCO TOWER

KIPCO TOWER

BIM
KIPCO TOWER CLIENT: SSHAREA: 86,074 Sq. MtLOCATION: KUWAIT CITY, KUWAIT PROJECT TEAM : KESHAV, PAVAN, VINOD, TRINADHLOD: 350STATUS: COMPLETED DESIGN CHALLENGE : 1) Intricate detailing of curtain wall system and identification of the various glazing panels. 2) Modelled in the year 2006, wherein BIM application was at its infancy.3) Scope included LOD 350 model. [SLGF id=211] Back
Read More
Hospital Campus

Hospital Campus

BIM
Hospital Campus CLIENT: CAS, USAAREA: 13,59,140.0 Sq. FtLOCATION: LA, USAPROJECT TEAM : TRINADHLOD: 350STATUS : COMPLETED BIM CHALLENGE : 1) Coordinated and modelled wall framing models for 7 different department buildings. 2) Whole project was awarded because of the precision and expertise level of modelling in one block of the project.3) Developed automation tool to reduce time in developing templates for each panel from 3 hours to 15 mins., drastically changing the turn around and project closing time. [SLGF id=200] Back
Read More
Commercial Office 2

Commercial Office 2

BIM
Commercial Office Headquarters CLIENT: CAS, USAAREA: 48,588 Sq. MtLOCATION: CA, USAPROJECT TEAM : VINOD, TRINADH, RUDRAPRASADLOD: 400STATUS : COMPLETED DESIGN CHALLENGE : 1) Scripted Navis Works (API) plug-in to generate clash reports publication to enable offline/on-site usage. reports are hyperlinked for field iPad's drawings to understand clash / construction difficulty.2) Customised use of Dynamo to automate the metal stud categorization for construction & logistics. Developed several dynamo scripts to automate sheet generation for Panel drawings.3) Being a design assist contract, fast turn-arounds of changes were required to be documented highlighting the cost and time implications. [SLGF id=186] Back
Read More
Commercial Office 1

Commercial Office 1

BIM
COMMERCIAL OFFICE HEADQUARTERS CLIENT: CAS, USAAREA: 2,60,128 Sq. MtLOCATION: CA, USAPROJECT TEAM : VINOD, TRINADHLOD: 400STATUS : COMPLETED DESIGN CHALLENGE : 1) Clash free coordinated dry wall & ceiling modelling to LOD 400. 2) To organize information to facilitate simultaneous construction activity, a quick turnaround was warranted 3) Automation of pre-fabrication trades such as providing unique identity & quantities to the various members so as to logistically streamline the assembly process. [SLGF id=177] Back
Read More